Monday, April 26, 2010

Update...slab lines drawn and frame materials delivered

I took the family to see the block the other day. We were having a great time walking through 'the house'. They were even considerate enough to take their shoes off at the front door.

We noticed the frame materials have turned up which is exciting. We should have the frame up this week or next.

The frame lines have been done so we can see how big the rooms are going to be. There has been an error made with one of the lines and I'm glad i've noticed it now and not after the frame has gone up. They've got lines drawn in the Master bedroom showing two walls at a 90 degree join in one place when it is suppose to be angled nicely to give a bit more room. I think it will look better having angled walls. It is on the contract so the builder has to adjust the error. It looks more like they've forgotten to draw the angle lines on the slab rather than misreading the plan........then again anything is possible.

I'll post more pictures this week when the builders are putting the frame together. Watch this space!

For now, adios!